BOKAWATER · Specialist series01 / Wastewater treatment
BOKAWATERWastewater treatment
Wastewater treatment

Communities & developments

A decentralized community project should consider phased occupancy as well as its final design population. Map collection, pumping and treatment responsibilities before choosing equipment. Clarify the treatment target with the project engineer and identify the team responsible for long-term operation, monitoring and residuals management.

Questions worth settling early

  • Current and future service population
  • Collection and civil works responsibility
  • Long-term operation and residuals plan

What to prepare

  • Average and peak daily flow; operating days
  • Wastewater source, water analysis and seasonal changes
  • Required discharge or reuse target supplied by the project
  • Available space, electrical supply and operator availability

Make the scope explicit

Ask the proposal to distinguish equipment supply, civil works, external piping, electrical connections, commissioning, training and consumables. Confirm each responsibility in the project quotation. Items discussed on this website are planning considerations, not an automatic inclusion in every supply package.

Equipment capacity needs a defined wastewater basis, not only a tank size.
Discuss your project ↗

Bring us the conditions. Let’s define the system.

A useful enquiry can start before every parameter is known. Tell us what you know and where engineering input is needed.

Discuss your project